Section 2 Preparation
2-37
When pumping solvents the first time, inspect the solvent and
waste connections to the system. If any leaks are observed, click
the STOP button. Correct the leak by tightening the fitting an
additional
1
4 turn, and then restart the pump by touching the
PRIME B button.
7. After at least 400 mL of solvent has been pumped, touch
the S
TOP button.
8. Touch the P
RIME A button. The solvent pump will start.
Inspect the solvent and waste lines and correct leaks if
necessary.
9. After at least 400 mL of solvent has been pumped, touch
the S
TOP button.
10.Close the Manual Control window.
11.After the pressure gauge on the touch screen has returned
to 0 psi, remove the column bypass tube and disconnect the
solid load cartridge tubing from the Sample Injection Port.
The column bypass tube should be drained and returned to
the accessory kit.
If using the optional Sample Load Pump, purge the pump with at
least 20 mL of Solvent A and run the pump dry.
After purging the lines, the system is ready for the optional
system verification (Section 2.15) or operation (Section 3).
2.15 System Verification with Test Mix B
It is recommended that the system operation be verified. To do
so, perform a purification run using the supplied test mix vial.
1. Connect the Liquid Injection Accessory (60-5244-059) from
the accessory kit (60-5249-002) to the Sample Injection
Port.
2. Load a 330 gram column (69-2203-330) on the Torrent.
Rotate the column so the label faces the RFID antenna.