
CombiFlash Torrent® User Manual
2-2
Compare the contents of the boxes with the enclosed packing
slips. If there are any shortages, contact Teledyne Isco
immediately.
2.2 Instrument Location
The Torrent has a relatively small footprint for a
development-scale instrument, requiring about 2200 square
centimeters (350 in
2
) of level bench space. Ensure that the
Torrent has at least 3 cm (1.25") of air space behind it for
ventilation. Additional space may be required for solvent and
waste containers, and fraction collection.
Refer to Table 1-1 for environmental conditions and power
requirements.
The system is heavy. Use a two-person lift to prevent injury.
Before making any connections to the Torrent, place it on the
bench or in the fume hood where it will be operated.
Temporarily position the Torrent so you can access the back
panel to complete the connections.
2.3 Connect Power
Ensure that the On/Standby switch below the touch screen
panel is in the Standby position. Then, use the supplied IEC
power cord to connect the Torrent to mains power.
Mains power must meet the voltage, frequency, and amperage
requirements listed on the serial number label. Input voltage
must be within ±10% of the region’s nominal line voltage. In
the USA, this is 117 volts ±11.7 volts.
As long as the AC mains power cord is connected to a live
outlet, power is inside the unit. The mains power cord is the
disconnect device. Position the Torrent so that the power cord
can be unplugged, or use a power strip where the plug can
Comentarios a estos manuales