
CombiFlash Torrent® User Manual
2-12
2.10 Install Optional Equipment
The installation of optional equipment that was electrically
connected to the Torrent in section 2.4 should be completed
now. Review the options below and complete as necessary.
2.10.1 Optional Sample Load Pump
1. Position the Sample Load Pump on top or near the Torrent.
2. Connect the tubing between the pump outlet (from the
bottom of the pump head) and the Torrent’s sample
injection port (Figure 1-1, item 9).
3. Configure the Sample Load Pump by placing either the
plastic cartridge reservoir or the tubing with the weighted
end on the pump inlet (Figure 2-3).
Figure 2-3 Sample load pump
Pump Outlet
To Sample Injection Port
Cartridge Reservoir
Tubing with
Weighted End
Pump Inlet
Comentarios a estos manuales