
CombiFlash Torrent® User Manual
2-36
Except during an emergency, never remove AC power
immediately after placing the Power switch in the Off position. The
power down sequence includes file maintenance that takes up to
one minute to complete. Interrupting the file maintenance may
corrupt files causing abnormal operation or a complete system
failure.
3. After one minute or more, place the Power switch in the On
position.
4. The Torrent is ready for operation when the PeakTrak
screen is displayed.
2.14 Purge the Internal Solvent Lines
The Torrent is shipped from the factory with isopropyl alcohol
in the internal lines. Before the first use, the lines should be
purged. To do so:
1. Connect the solid load cartridge tubing to the sample
injection port (Figure 1-1).
Pinch point. Your fingers or hands can be seriously
injured if you place them between the moving parts of
the Solid Load Cartridge Cap Mount or the Upper
Column Mount. Use care when installing solid load
cartridges or columns.
2. Insert the column bypass tube (part number 209-0165-76
from accessory kit 60-5249-002).
3. Ensure that the Solvent A inlet line is receiving hexane,
and the Solvent B inlet is receiving ethyl acetate.
4. Select the “Tools>Manual Control” menu command to open
the Manual Control window.
5. Select the T
HROUGH COLUMN & CARTRIDGE Valve Position
setting.
6. Touch the P
RIME B button. The solvent pump will start.
Comentarios a estos manuales