Translation of the original operation manual 27
MDFE_mAtex_1307_en • jw
Start-up and operation
5 Start-up and operation
5.1 First cleaning
This Fluid Heater was function tested at factory using a test-
medium.
To ensure that no test medium is left in the pump, the entire system should
first be flushed using the solvent recommended by the manufacturer of the
coating to be used.
➤ Disconnect the heater from the power source.
➤ Now complete all steps covering the initial flushing found in the spraying
equipment's Operation manual.
For best results, we recommend flushing the system for approximately one
minute. To avoid any danger of explosion, do not allow the solvent to circulate
for more than 5 minutes and ensure that the amount of available solvent cor-
responds to the size of the pump used. Depending on the pump, at least 8 to
25 liters (2 to 6.5 gallons) of solvent are necessary.
5.2 Pressure testing
The maximum operating pressure of the Fluid Heater must be
equal to or greater than the max. operating pressure of the spraying
equipment and any accessories.
The lowest value is to be taken for the complete system.
➤ Disconnect the heater from the power source.
➤ Ensure that the
Fluid Heater has been connected correctly
according to the instructions in chap. 3.3 Unit structure on page 19 and
that all fittings are tightened properly.
➤ Now complete all steps found in the spray equipment's Operation manual
covering pressure testing of the system.
5.3 Unit preparation
➤ Always remember that the Fluid Heater may only be flushed
when cold an disconnected from the electrical power supply.
➤ Always observe the working temperature given by the manufacturer of
the coating to be heated.
➤ Check to ensure that accessories (i.e.temperature gauges, back pressure
valves) are connected correctly.
➤ Check to ensure that the pressure ratings of all system components
and accessorires correspond to the maximum operating pressure of the
Fluid Heater.
➤ Check for the proper ground of:
– spray pump
– Fluid Heater
– accessories
– object to be coated
➤ Observe all instructions found in the Operation manual for the spray
pump and all accessories.
➤ When starting the unit and after any repairs, maintenance or cleaning
mind. 1 minute
max. 5 minutes
approx. 8-25 l
(2-6.5 gal.)